Events on Hollandse Kust Noord

Netherlands
Fully Commissioned
759MW Capacity
4C Offshore | Location Map: Lat(52.710) Lon(4.260)

Events overview for Hollandse Kust Noord

Event Date Event Type Event

Description

Event Source
Gain full access Gain full access

Event Date: Gain full access

Event Type: Gain full access

Gain full access

Gain full access
Unlock free insights 2025 Other

Event Date: Unlock free insights 2025

Event Type: Other

TNO, the Dutch organization for applied scientific... Gain full access

Gain full access
Unlock free insights 2024 Other

Event Date: Unlock free insights 2024

Event Type: Other

Update (25 October 2024): As of the week of the 14... Gain full access

Gain full access
Unlock free insights 2024 Other Approval

Event Date: Unlock free insights 2024

Event Type: Other Approval

Hollandse Kust Noord has received a Project Certif... Gain full access

Gain full access
Unlock free insights 2024 Corporate PPA Secured

Event Date: Unlock free insights 2024

Event Type: Corporate PPA Secured

Google have signed power purchase agreements with ... Gain full access

Gain full access
Unlock free insights 2023 Fully Commissioned

Event Date: Unlock free insights 2023

Event Type: Fully Commissioned

Update 20th December 2023: Hollandse Kust Noord is... Gain full access

Gain full access
Unlock free insights 2023 Onshore Substation

Event Date: Unlock free insights 2023

Event Type: Onshore Substation

TenneT has awarded BAM Infra Nederland a contract ... Gain full access

Gain full access
Unlock free insights 2023 Turbine

Event Date: Unlock free insights 2023

Event Type: Turbine

CrossWind has installed the 69th and final wind tu... Gain full access

Gain full access
Unlock free insights 2023 Array Cable

Event Date: Unlock free insights 2023

Event Type: Array Cable

Inter-array cable installation and burial is compl... Gain full access

Gain full access
Unlock free insights 2023 Generating Power

Event Date: Unlock free insights 2023

Event Type: Generating Power

Hollandse Kust Noord has now produced its first me... Gain full access

Gain full access
Unlock free insights 2023 Array Cable

Event Date: Unlock free insights 2023

Event Type: Array Cable

Van Oord have announced that cable laying vessel N... Gain full access

Gain full access
Unlock free insights 2023 Export Cable

Event Date: Unlock free insights 2023

Event Type: Export Cable

Update 22/03/2023: Van Oord is laying 140 km of ca... Gain full access

Gain full access
Unlock free insights 2023 Turbine

Event Date: Unlock free insights 2023

Event Type: Turbine

The first of 69 turbines has been installed. Trans... Gain full access

Gain full access
Unlock free insights 2023 Grid Connection Available

Event Date: Unlock free insights 2023

Event Type: Grid Connection Available

Update 17/03/2023: Final checks on the grid connec... Gain full access

Gain full access
Unlock free insights 2023 Consultation

Event Date: Unlock free insights 2023

Event Type: Consultation

Online information session for Hollandse Kust Noor... Gain full access

Gain full access
Unlock free insights 2023 Foundation

Event Date: Unlock free insights 2023

Event Type: Foundation

MPI Resolution arrived on site at Hollandse Kust N... Gain full access

Gain full access
Unlock free insights 2023 Foundation

Event Date: Unlock free insights 2023

Event Type: Foundation

Final monopile, of a total of 70 monopiles, has be... Gain full access

Gain full access
Unlock free insights 2023 Other

Event Date: Unlock free insights 2023

Event Type: Other

Rotra Vente has delivered the first wind turbine p... Gain full access

Gain full access
Unlock free insights 2022 Export Cable

Event Date: Unlock free insights 2022

Event Type: Export Cable

Update February 2023: TenneT will be officially co... Gain full access

Gain full access
Unlock free insights 2022 Foundation

Event Date: Unlock free insights 2022

Event Type: Foundation

Update February 2023: Final monopile, of a total o... Gain full access

Gain full access
Unlock free insights 2022 Offshore Construction Starts

Event Date: Unlock free insights 2022

Event Type: Offshore Construction Starts

Update 18/10/22: Offshore construction starts, ins... Gain full access

Gain full access
Unlock free insights 2022 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2022

Event Type: Production, fabrication, transport and pre-assembly

Sif Group has started manufacturing Transition Pie... Gain full access

Gain full access
Unlock free insights 2022 Offshore Substation

Event Date: Unlock free insights 2022

Event Type: Offshore Substation

Update 04/10/2022: Topside installed by Orion on T... Gain full access

Gain full access
Unlock free insights 2022 Export Cable

Event Date: Unlock free insights 2022

Event Type: Export Cable

Update 05/10/22: Sea cables are already in the sea... Gain full access

Gain full access
Unlock free insights 2022 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2022

Event Type: Procurement Process (Supply Chain)

The Rijkswaterstaat has released a tender for main... Gain full access

Gain full access
Unlock free insights 2022 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2022

Event Type: Production, fabrication, transport and pre-assembly

Update 4th May 2022: the offshore substation for T... Gain full access

Gain full access
Unlock free insights 2022 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2022

Event Type: Production, fabrication, transport and pre-assembly

Load out of the offshore substation topside from S... Gain full access

Gain full access
Unlock free insights 2022 Export Cable

Event Date: Unlock free insights 2022

Event Type: Export Cable

A barge carrying export cables is heading towards ... Gain full access

Gain full access
Unlock free insights 2022 Other

Event Date: Unlock free insights 2022

Event Type: Other

The work for the construction of the casing pipes ... Gain full access

Gain full access
Unlock free insights 2022 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2022

Event Type: Production, fabrication, transport and pre-assembly

Sif plans to begin construction of the foundations... Gain full access

Gain full access
Unlock free insights 2021 Onshore Cable

Event Date: Unlock free insights 2021

Event Type: Onshore Cable

The first electricity cables were successfully ins... Gain full access

Gain full access
Unlock free insights 2021 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2021

Event Type: Production, fabrication, transport and pre-assembly

LS Cable & System and Jan De Nul Group have announ... Gain full access

Gain full access
Unlock free insights 2021 Offshore Substation

Event Date: Unlock free insights 2021

Event Type: Offshore Substation

TenneT has successfully installed the 2,100-ton su... Gain full access

Gain full access
Unlock free insights 2021 Offshore Substation

Event Date: Unlock free insights 2021

Event Type: Offshore Substation

In November DEME group has successfully transporte... Gain full access

Gain full access
Unlock free insights 2021 Offshore Substation

Event Date: Unlock free insights 2021

Event Type: Offshore Substation

Update 1st Nov: The Hollandse Kust (north) jacket ... Gain full access

Gain full access
Unlock free insights 2021 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2021

Event Type: Production, fabrication, transport and pre-assembly

Update 19th October: load out of the HKN jacket to... Gain full access

Gain full access
Unlock free insights 2021 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2021

Event Type: Production, fabrication, transport and pre-assembly

SLPE states that the Hollandse Kust (Noord) OSS su... Gain full access

Gain full access
Unlock free insights 2021 Site Investigation

Event Date: Unlock free insights 2021

Event Type: Site Investigation

In September 2021, Van Oord kicked off an Unexplod... Gain full access

Gain full access
Unlock free insights 2021 Other

Event Date: Unlock free insights 2021

Event Type: Other

Update 1st September: NRG commenced work on the la... Gain full access

Gain full access
Unlock free insights 2021 Construction - Seabed Preparation

Event Date: Unlock free insights 2021

Event Type: Construction - Seabed Preparation

During the soil investigation in preparation for l... Gain full access

Gain full access
Unlock free insights 2021 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2021

Event Type: Production, fabrication, transport and pre-assembly

TenneT has completed testing of its (400MVA/230kV)... Gain full access

Gain full access
Unlock free insights 2021 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2021

Event Type: Production, fabrication, transport and pre-assembly

Transformer platforms complete and on the way to t... Gain full access

Gain full access
Unlock free insights 2021 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2021

Event Type: Production, fabrication, transport and pre-assembly

Update May 2021: HFG reports that fabrication is w... Gain full access

Gain full access
Unlock free insights 2021 Other

Event Date: Unlock free insights 2021

Event Type: Other

NRG is progressing with drilling works for the ons... Gain full access

Gain full access
Unlock free insights 2021 Engineering

Event Date: Unlock free insights 2021

Event Type: Engineering

TU Delft, Siemens Gamesa Renewable Energy (SGRE), ... Gain full access

Gain full access
Unlock free insights 2021 Consultation

Event Date: Unlock free insights 2021

Event Type: Consultation

The draft decision and the underlying documents fo... Gain full access

Gain full access
Unlock free insights 2021 Other

Event Date: Unlock free insights 2021

Event Type: Other

TenneT and CrossWind, a consortium of Shell and En... Gain full access

Gain full access
Unlock free insights 2021 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2021

Event Type: Production, fabrication, transport and pre-assembly

TenneT has awarded BAM Infra Nederland a contract ... Gain full access

Gain full access
Unlock free insights 2021 Offtake Conditionally Secured

Event Date: Unlock free insights 2021

Event Type: Offtake Conditionally Secured

Amazon signed a corporate PPA to offtake 380 MW (2... Gain full access

Gain full access
Unlock free insights 2021 Other

Event Date: Unlock free insights 2021

Event Type: Other

The first casing pipes for laying the land cables ... Gain full access

Gain full access
Unlock free insights 2020 Onshore Construction Starts

Event Date: Unlock free insights 2020

Event Type: Onshore Construction Starts

Update 11/01/2021: The drill arived mid-december a... Gain full access

Gain full access
Unlock free insights 2020 Site Investigation

Event Date: Unlock free insights 2020

Event Type: Site Investigation

Next Geosolutions has commenced site investigation... Gain full access

Gain full access
Unlock free insights 2020 Site Investigation

Event Date: Unlock free insights 2020

Event Type: Site Investigation

From mid-December 2020 until the end of January 20... Gain full access

Gain full access
Unlock free insights 2020 Production, fabrication, transport and pre-assembly

Event Date: Unlock free insights 2020

Event Type: Production, fabrication, transport and pre-assembly

Smulders announced that the cutting of the first s... Gain full access

Gain full access
Unlock free insights 2020 Geotechnical Site Investigation

Event Date: Unlock free insights 2020

Event Type: Geotechnical Site Investigation

Update 7th October: The seabed survey is now compl... Gain full access

Gain full access
Unlock free insights 2020 Offtake Conditionally Secured

Event Date: Unlock free insights 2020

Event Type: Offtake Conditionally Secured

Update 29/07/2020: The Ministry of Economic Affair... Gain full access

Gain full access
Unlock free insights 2020 Financial Close

Event Date: Unlock free insights 2020

Event Type: Financial Close

Eneco confirmed that the project has already reach... Gain full access

Gain full access
Unlock free insights 2020 Site Exclusivity

Event Date: Unlock free insights 2020

Event Type: Site Exclusivity

The Ministry of Economic Affairs and Climate annou... Gain full access

Gain full access
Unlock free insights 2020 Site Investigation

Event Date: Unlock free insights 2020

Event Type: Site Investigation

Vattenfall awarded UXOcontrol the contract to comp... Gain full access

Gain full access
Unlock free insights 2020 Other Approval

Event Date: Unlock free insights 2020

Event Type: Other Approval

The Council of State issued a decision on the Holl... Gain full access

Gain full access
Unlock free insights 2020 Offtake/Site Tender or Process

Event Date: Unlock free insights 2020

Event Type: Offtake/Site Tender or Process

The Netherlands Enterprise Agency (RVO) has receiv... Gain full access

Gain full access
Unlock free insights 2020 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2020

Event Type: Procurement Process (Supply Chain)

TenneT expect to sign the contract for 220 kV subs... Gain full access

Gain full access
Unlock free insights 2020 Offtake/Site Tender or Process

Event Date: Unlock free insights 2020

Event Type: Offtake/Site Tender or Process

Update 2nd April: bidding window opened 2nd April ... Gain full access

Gain full access
Unlock free insights 2020 Offtake/Site Tender or Process

Event Date: Unlock free insights 2020

Event Type: Offtake/Site Tender or Process

Vattenfall has confirmed that its has decided not ... Gain full access

Gain full access
Unlock free insights 2020 Other

Event Date: Unlock free insights 2020

Event Type: Other

On Monday 23 March, TenneT will start preparatory ... Gain full access

Gain full access
Unlock free insights 2020 Financing Agreement

Event Date: Unlock free insights 2020

Event Type: Financing Agreement

The European Investment Bank has approved a loan o... Gain full access

Gain full access
Unlock free insights 2020 Strategy or Policy Development

Event Date: Unlock free insights 2020

Event Type: Strategy or Policy Development

The is a possibility of connecting the HKN wind fa... Gain full access

Gain full access
Unlock free insights 2020 Other

Event Date: Unlock free insights 2020

Event Type: Other

On Wednesday, January 15th 2020 an information mee... Gain full access

Gain full access
Unlock free insights 2019 Offtake/Site Tender or Process

Event Date: Unlock free insights 2019

Event Type: Offtake/Site Tender or Process

update 1712/19: The definitive Regulation on the l... Gain full access

Gain full access
Unlock free insights 2019 Consultation

Event Date: Unlock free insights 2019

Event Type: Consultation

From 5th December to 20th December 2019 the concep... Gain full access

Gain full access
Unlock free insights 2019 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2019

Event Type: Procurement Process (Supply Chain)

TenneT issued a survey for UXO Survey, Identificat... Gain full access

Gain full access
Unlock free insights 2019 Consultation

Event Date: Unlock free insights 2019

Event Type: Consultation

TenneT applied for revised permit applications for... Gain full access

Gain full access
Unlock free insights 2019 Consultation

Event Date: Unlock free insights 2019

Event Type: Consultation

The government has made a permit available for the... Gain full access

Gain full access
Unlock free insights 2019 Appeal Process

Event Date: Unlock free insights 2019

Event Type: Appeal Process

Three appeals for the Hollandse Kust (Noord) grid ... Gain full access

Gain full access
Unlock free insights 2019 Other

Event Date: Unlock free insights 2019

Event Type: Other

The final version of the Project & Site Descriptio... Gain full access

Gain full access
Unlock free insights 2019 Strategy or Policy Development

Event Date: Unlock free insights 2019

Event Type: Strategy or Policy Development

Minister of Economic Affairs and Climate Eric Wieb... Gain full access

Gain full access
Unlock free insights 2019 Strategy or Policy Development

Event Date: Unlock free insights 2019

Event Type: Strategy or Policy Development

On 29 May 2019, the Council of State ruled that th... Gain full access

Gain full access
Unlock free insights 2019 Other

Event Date: Unlock free insights 2019

Event Type: Other

The loan application for EUR 500 million is under ... Gain full access

Gain full access
Unlock free insights 2019 Other Approval

Event Date: Unlock free insights 2019

Event Type: Other Approval

On August 12th, 2019, the Council of State said it... Gain full access

Gain full access
Unlock free insights 2019 Appeal Process

Event Date: Unlock free insights 2019

Event Type: Appeal Process

The final site decisions will be available for ins... Gain full access

Gain full access
Unlock free insights 2019 Consultation

Event Date: Unlock free insights 2019

Event Type: Consultation

The definitive documents for the transmission syst... Gain full access

Gain full access
Unlock free insights 2019 Other

Event Date: Unlock free insights 2019

Event Type: Other

The Wind Resource Assessment for Hollandse Kust (n... Gain full access

Gain full access
Unlock free insights 2019 Other Approval

Event Date: Unlock free insights 2019

Event Type: Other Approval

TenneT has been granted an Environmental Permit fo... Gain full access

Gain full access
Unlock free insights 2019 Offtake/Site Tender or Process

Event Date: Unlock free insights 2019

Event Type: Offtake/Site Tender or Process

The final site decisions have been made available.... Gain full access

Gain full access
Unlock free insights 2019 Consent Authorised

Event Date: Unlock free insights 2019

Event Type: Consent Authorised

The final site decisions have been made available.... Gain full access

Gain full access
Unlock free insights 2019 Engineering

Event Date: Unlock free insights 2019

Event Type: Engineering

Work on the future site of the transformer station... Gain full access

Gain full access
Unlock free insights 2019 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2019

Event Type: Procurement Process (Supply Chain)

TenneT will invite the bidders to tender for Sea C... Gain full access

Gain full access
Unlock free insights 2019 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2019

Event Type: Procurement Process (Supply Chain)

TenneT will invite the potential bidders to tender... Gain full access

Gain full access
Unlock free insights 2018 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2018

Event Type: Procurement Process (Supply Chain)

The tender procedure for the subsea cables and pla... Gain full access

Gain full access
Unlock free insights 2018 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2018

Event Type: Procurement Process (Supply Chain)

TenneT has issued a call for competition for deliv... Gain full access

Gain full access
Unlock free insights 2018 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2018

Event Type: Procurement Process (Supply Chain)

TenneT has issued a pre-qualification for upcoming... Gain full access

Gain full access
Unlock free insights 2018 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2018

Event Type: Procurement Process (Supply Chain)

Rijksdienst voor Ondernemend Nederland (RVO.nl) p... Gain full access

Gain full access
Unlock free insights 2018 Geotechnical Site Investigation

Event Date: Unlock free insights 2018

Event Type: Geotechnical Site Investigation

Geotechnical survey by Fugro will take place from ... Gain full access

Gain full access
Unlock free insights 2018 Site Investigation

Event Date: Unlock free insights 2018

Event Type: Site Investigation

Fugro was awarded the contract to conduct geotechn... Gain full access

Gain full access
Unlock free insights 2018 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2018

Event Type: Procurement Process (Supply Chain)

Period closes for submitting proposals for geotech... Gain full access

Gain full access
Unlock free insights 2017 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2017

Event Type: Procurement Process (Supply Chain)

Netherlands Enterprise Agency (RVO.nl) open geote... Gain full access

Gain full access
Unlock free insights 2017 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2017

Event Type: Procurement Process (Supply Chain)

Netherlands Enterprise Agency (RVO.nl) has issued ... Gain full access

Gain full access
Unlock free insights 2017 Site Investigation

Event Date: Unlock free insights 2017

Event Type: Site Investigation

Fugro was contracted by RVO.nl to conduct the geop... Gain full access

Gain full access
Unlock free insights 2017 Site Investigation

Event Date: Unlock free insights 2017

Event Type: Site Investigation

Fugro was contracted by RVO.nl to conduct the geop... Gain full access

Gain full access
Unlock free insights 2017 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2017

Event Type: Procurement Process (Supply Chain)

TenneT released the tender for the offshore collec... Gain full access

Gain full access
Unlock free insights 2017 Other

Event Date: Unlock free insights 2017

Event Type: Other

A tender was published for geophysical investigati... Gain full access

Gain full access
Unlock free insights 2017 Met Mast/LiDAR

Event Date: Unlock free insights 2017

Event Type: Met Mast/LiDAR

Two Seawatch Wind LiDAR Buoys (SWLB) were deployed... Gain full access

Gain full access
Unlock free insights 2016 Other Approval

Event Date: Unlock free insights 2016

Event Type: Other Approval

The government approves additional area within the... Gain full access

Gain full access
Unlock free insights 2016 Other Application Submitted

Event Date: Unlock free insights 2016

Event Type: Other Application Submitted

The Dutch government highlights two areas for cons... Gain full access

Gain full access
Unlock free insights 2016 Met Mast/LiDAR

Event Date: Unlock free insights 2016

Event Type: Met Mast/LiDAR

Fugro deployed 1 SeaWatch Wind LIDAR buoy deployed... Gain full access

Gain full access
Unlock free insights 2015 Other

Event Date: Unlock free insights 2015

Event Type: Other

TenneT launched the so-called accreditation scheme... Gain full access

Gain full access
Unlock free insights 2015 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2015

Event Type: Procurement Process (Supply Chain)

TenneT opened a tender for the qualification syste... Gain full access

Gain full access
Unlock free insights 2015 Met Mast/LiDAR

Event Date: Unlock free insights 2015

Event Type: Met Mast/LiDAR

Fugro deployed 1 SeaWatch Wind LIDAR buoy deployed... Gain full access

Gain full access
Unlock free insights 2014 Site Investigation

Event Date: Unlock free insights 2014

Event Type: Site Investigation

Geophysical and geotechnical soil investigations s... Gain full access

Gain full access
Unlock free insights 2014 Other

Event Date: Unlock free insights 2014

Event Type: Other

Both the 2017/2018 and 2019 tender areas are propo... Gain full access

Gain full access
Unlock free insights 2014 Other

Event Date: Unlock free insights 2014

Event Type: Other

The Dutch government released the Rijksstructuurvi... Gain full access

Gain full access
Unlock free insights 2014 Procurement Process (Supply Chain)

Event Date: Unlock free insights 2014

Event Type: Procurement Process (Supply Chain)

Tender for a framework agreement's, with a potenti... Gain full access

Gain full access

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Explorer Insights and Full. Explorer Insights allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Free account registration

Register today at no cost to our Explorer Insights subscription and access more of the 4C Offshore database and additional functionality such as tailored notifications, enhanced search capabilities.

Understand the market and make better decisions with access to the entire 4C Offshore database through our Premium subscription, providing crucial marketing intelligence across all major segments of the offshore renewable energy sector.

Premium users have unlimited access to a comprehensive dashboard of options via our dedicated web app with exclusive access to online and offline databases, analysis, reports, webinars, newsletters, interactive online tools, maps and more. Enquire today by selecting the “Premium” tab above.

Account Usage
Main Interest
I have read the privacy policy. and agree to the terms of service.

Ask us about our premium subscription

Gain access to the 4C Offshore web app and dashboard, the powerful intelligence tool fueled by TGS offshore global wind market data and insights.

Full, unlimited access to exclusive offshore data and insight to fuel your wind development decisions.

Discover insights through detailed graphs and charts to help you calculate market shares and explore ownership stakes and costs.

Main Interest
I have read the privacy policy. and agree to the terms of service.