Thor Offshore Wind Farm

Denmark
Pre-Construction
1008 MW Capacity
31 Jan 2025: Update 9/1/2025: Energinet has confirmed that the point of connection for Thor will be ready by the end of January. Update 27/03/20: Establishment of necessary nearshore facilities from POC and grid connection forward to the transmission grid at Idomlund will be provided by the Danish TSO, Energinet. The onshore grid connection will be built to receive 1 000 MW in the POC and will be available to receive first power by Q1 2025. If Energinet fails to fulfil its obligations with respect to commissioning, Energinet will be liable in damages for the loss suffered by the concessionaire in this respect. Compensation for lost production will be based on the bid-price, and it will be calculated on the basis of the production the wind turbines would have produced under the current conditions. The calculation of lost production will include revenues lost less costs saved. No compensation will be paid in the event of a force majeure. Force majeure covers circumstances arising at no fault of the Concessionaire/Energinet, and which are beyond the control of the Concessionaire/Energinet. update 13/03/20: During the Thor market dialogues, held as part of the tender process, market players made it clear that they would not be able to grid connect Thor until Q1 2025, thus emphasizing that the planned grid connection for Q2 2024 would be needless.  In order to optimize the possibilities for cost savings, it has been decided to provide the Danish TSO, Energinet, with the flexibility to adjust the grid connection to Q1 2025. The adjustment of the grid connection does not change the overall plans for Thor, which is scheduled to be fully commissioned by the end of 2027. Grid connection available Q2 2024. As outlined in the Energy Agreement of 2018, Thor shall be grid connected in the period 2024-2027.
4C Offshore | Location Map: Lat(56.329) Lon(7.641)
General Information
Name
Thor
Other Names
Horns Rev 4
Country
Denmark
Development Status
Pre-Construction
Category or Round
Unlock with free limited access
Region
Unlock with free limited access
Comments
Unlock with free limited access
Website
Unlock with free limited access
Developers/Owners/Operators

Developer

Thor Wind Farm I/S

Thor Wind Farm I/S

Owner

RWE AG

RWE AG

Key Dates
Costs
Stated Project Cost
Gain full access with Premium membership
Revenue Mechanism
Gain full access with Premium membership
Revenue Details
Gain full access with Premium membership
Revenue
DKK 0.1/MWh (EUR 0.01/MWh)

Gain Unmatched Insight into the Global Offshore Wind & Transmission Markets

Want to stay ahead in the fast-paced offshore wind industry?

Access real-time insights on wind farms, infrastructure, cables, ports, and vessels to stay informed on the latest trends. With 4C Offshore's intelligence, you'll have the data and analysis you need to make smart, timely decisions.

Why 4C Offshore?

Our platform delivers cost-effectve, industry-leading intelligence with deep data coverage and expert tools to support your decisions.

Access Options

  • Explorer Insights (Free): Personalize alerts, use search tools, and access key data.
  • Premium (Full Access): Unlock unlimited interactive tools, reports, updates, and the full 4C Offshore dashboard.

Learn how 4C Offshore can transform your business - register now or inquire below

Power & Turbines
Location & Environment
Sea Name
North Sea
Latitude
56.328958°
Longitude
Gain full access with Premium membership
Area
Unlock with free limited access
Depth Range (Chart Datum)
Gain full access with Premium membership
Depth Range (Stated by Developer)
Gain full access with Premium membership
Distance from Shore (Developer)
Unlock with free limited access
Distance from Shore (Computed)
Gain full access with Premium membership
Ports
Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Gain full access with Premium membership
Grid Connection Point
Unlock with free limited access
Cable Landing Point
Gain full access with Premium membership
Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with free limited access
Average Length per Cable (AC)
Gain full access with Premium membership
Additional Requirements (AC)
Gain full access with Premium membership
Nominal Voltage (AC)
Gain full access with Premium membership
Number of Export Cables (DC)
Gain full access with Premium membership
Average Length per Cable (DC)
Unlock with free limited access
Additional Requirements (DC)
Gain full access with Premium membership
Nominal Voltage (DC)
Gain full access with Premium membership
Array Cables
Onshore Cables

Free account registration

Register today at no cost to our Explorer Insights subscription and access more of the 4C Offshore database and additional functionality such as tailored notifications, enhanced search capabilities.

Understand the market and make better decisions with access to the entire 4C Offshore database through our Premium subscription, providing crucial marketing intelligence across all major segments of the offshore renewable energy sector.

Premium users have unlimited access to a comprehensive dashboard of options via our dedicated web app with exclusive access to online and offline databases, analysis, reports, webinars, newsletters, interactive online tools, maps and more. Enquire today by selecting the “Premium” tab above.

Account Usage
Main Interest
I have read the privacy policy. and agree to the terms of service.

Ask us about our premium subscription

Gain access to the 4C Offshore web app and dashboard, the powerful intelligence tool fueled by TGS offshore global wind market data and insights.

Full, unlimited access to exclusive offshore data and insight to fuel your wind development decisions.

Discover insights through detailed graphs and charts to help you calculate market shares and explore ownership stakes and costs.

Main Interest
I have read the privacy policy. and agree to the terms of service.